Page 19 of 19 FirstFirst ... 9171819
Results 181 to 182 of 182

Thread: Greystones Model Railway Layout.

  1. #181
    The signal cabin looks excellent, a lovely piece of modelling.

  2. #182
    Hi All

    Thanks for the comments and looking in

    Today we set up the catenary masts which arrived on site last week, there was a trial run of the switch cabin, and some palisade fencing was erected on the South-Eastern boundary of the station to stop the riff-raff bunking in from the beach....

    Name:  GS-137 IMAG2694.jpg
Views: 18
Size:  115.3 KB

    The support spars for the catenary wires are in manufacture at the moment, but we set up the posts to work out location and heights the masts need to be trimmed to.

    Name:  GS-138 IMAG2697.jpg
Views: 18
Size:  124.7 KB

    Name:  GS-139 IMAG2702.jpg
Views: 18
Size:  118.6 KB

    Name:  GS-140 IMAG2713.jpg
Views: 18
Size:  119.5 KB

    Name:  GS-141 IMAG2714.jpg
Views: 18
Size:  124.3 KB

    Name:  GS-142 IMAG2708.jpg
Views: 18
Size:  105.8 KB

    Name:  GS-143 IMAG2710.jpg
Views: 18
Size:  112.3 KB

    Name:  GS-144 IMAG2715.jpg
Views: 18
Size:  112.5 KB

    Oh! there's the 01.00 o'clock Commuter up from Wicklow! better go and meet me Mam for lunch.......
    Name:  GS-145 IMAG2718.jpg
Views: 18
Size:  138.6 KB

    Eoin & CM
    Last edited by murrayec; 1 Day Ago at 07:59 PM.
    www.ecmtrains.com - Manufacturing the Model Dart

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
About us
Welcome to Irish Railway Modeller. The home of Railway Modelling and collecting in Ireland. We are a friendly, open community where you will find lots of support, advice and encouragement, as well as inspiration! Join us today!
Join us